Skip to content

How do I edit a call sheet?

Click any cell on the call sheet and type, add rows with + Add row and remove them with the × at the end of the row; your changes are saved when you click Save.

Editing cells

  1. Open the day’s call sheet: How do I create a call sheet?

  2. Click the cell you want to change and type. Scene numbers, locations, characters and tag names that came from the schedule can be edited too.

    A time being typed into a cell of the scenes table, the other cells holding the location, scene and characters from the schedule.
  3. In a one-line cell, Enter moves you down one row in the same column. In the Departments boxes, Enter starts a new line.

  4. Click Save at the top right.

If you refresh the page without saving, the last saved version comes back. If you never saved, the tables fill from the schedule again.

Adding and removing rows

  1. + Add row under the scenes table adds an empty row. The cast table has + Add cast instead. The next day schedule has its own + Add row too.

  2. To remove a row, click the × at its far right.

    A new empty row at the end of the scenes table, × buttons at the far right of the rows, and the add row button under the table.
  3. Click Save.

When the schedule changes

The first time you save or download the call sheet, the scenes, cast and next day tables are kept as they are. If you then add, remove or reorder scenes on that day in the schedule, the call sheet doesn’t change on its own.

To refill a table from the schedule:

  1. Remove every row in that table with ×.
  2. Click Save.
  3. Refresh the page. The table fills from the current schedule. Whatever you typed in that table’s rows is gone; the other tables and the details at the top stay as they were.

The Departments section doesn’t refill this way, so update it by hand.

Before you delete a day

Deleting a shooting day deletes its call sheet too. In Stripboard, Delete day in the ⚙ menu on the day’s banner asks first; if the day has a call sheet, it says so, and whether it’s published. Auto Day Breaks rebuilds every day in the schedule, so it deletes the draft call sheets in that schedule, and its window says how many. If the schedule has a published call sheet, the split doesn’t run. If there’s a call sheet you want to keep, download it first: How do I export a call sheet?

If it doesn’t work

A scene I added to the schedule isn’t on the call sheet.
Once you save or download the call sheet, its tables are kept as they are, and later changes in the schedule don’t come in on their own. Add the scene by hand with + Add row, or refill the table from the schedule: see When the schedule changes below.
A day’s call sheet has disappeared.
If you deleted the shooting day, or rebuilt the days with Auto Day Breaks, those days’ call sheets were deleted too and can’t be brought back. When you open the new day, its call sheet fills from the schedule again, but what you typed by hand doesn’t come back.
Couldn't save.
If this shows up when you click Save, don’t leave the page: what you typed is still on screen. Check your connection and click Save again. If your session has ended, log in again in another tab, then save again in this one.
Next article How do I export a call sheet?